Rehabilitation Study of Izadkhast Dam 
                    
					
					
				
			
			
			
            Rehabilitation Study of Izadkhast Dam 
            
			
			
			
			
            Project Status: Completed, 2015
            
			
			
			
            ABGEER Services: An investigation into the dam's instrumentation and behavior mapping system was conducted to identify areas for improvement. This investigation includes a detailed assessment of the dam's safety and stability, along with recommendations for enhancements. We collected data on the locations of geotechnical boreholes and conducted geological studies related to the design. Additionally, studies were performed to assess the dam's seismic risk, as well as to analyze the stability of the dam and its supports. A static analysis (stress-strain) of the dam's body and foundation was carried out to identify the causes of transverse and longitudinal cracks. Finally, an investigation of the dam's hydro-mechanical system was undertaken.