Main Menu
Home
About Us
Introduction and History
Goals, Visions and Missions
Organizational Chart and Senior Managers
Licenses, Qualifications and Certificates
Membership in Scientific and Professional Societies
Honors and Acknowledgements
Offices and Branches
Services
Dam Engineering
Irrigation and Drainage Networks
Water Resources Management
Monitoring and Rehabilitation of Dams
Hydropower Plants
River Protection and Engineering
Water and Wastewater Engineering
Geotechnical Engineering
Soil Improvement and Excavations
Geophysics
Structure
Management & Peer Review of Projects
BOT, BOO, EPC & PPP Projects
Operation of Hydro Projects
Projects
Dam Engineering
Irrigation & Drainage Networks
Water Resource Management
Water Transmission Lines
Monitoring and Rehabilitation of Dams
Hydropower Plants
Geotechnical Engineering
Soil Improvement and Excavations
Geophysics
Structure
Research
Papers
Books
Exhibitions
Conferences
Technical Trainings
Contact Us
Home
About Us
Introduction and History
Goals, Visions and Missions
Organizational Chart and Senior Managers
Licenses, Qualifications and Certificates
Membership in Scientific and Professional Societies
Honors and Acknowledgements
Offices and Branches
Services
Dam Engineering
Irrigation and Drainage Networks
Water Resources Management
Monitoring and Rehabilitation of Dams
Hydropower Plants
River Protection and Engineering
Water and Wastewater Engineering
Geotechnical Engineering
Soil Improvement and Excavations
Geophysics
Structure
Management & Peer Review of Projects
BOT, BOO, EPC & PPP Projects
Operation of Hydro Projects
Projects
Dam Engineering
Irrigation & Drainage Networks
Water Resource Management
Water Transmission Lines
Monitoring and Rehabilitation of Dams
Hydropower Plants
Geotechnical Engineering
Soil Improvement and Excavations
Geophysics
Structure
Research
Papers
Books
Exhibitions
Conferences
Technical Trainings
Contact Us
Monitoring-and-Rehabilitation-of-Dams
Rehabilitation of Nomel Dam
Location: Gorgan, Golestan, Iran
Project Status: Completed, 2003
ABGEER Services: Preparing a rehabilitation and improvement plan design as well as dam stability control
Rehabilitation of Berenjestanak Reservoir Dam
Location: Mazandaran, Iran
Project Status: Completed, 2003
ABGEER Services: Preparing a rehabilitation and improvement plan design as well as dam stability control
Rehabilitation of Qeshlaq Reservoir Dam Facilities
Location: Sanandaj, Kurdistan, Iran
Project Status: Completed, 2010
ABGEER Services: Due to issues with the dam's water intake system and lower spillway, rehabilitation studies were conducted. The remedial plan involved replacing the valves and installations at the lower spillway outlet, upgrading the pressure measurement system, installing a lift system in the control room, and setting up a diesel generator unit for operation during critical situations.
Rehabilitation studies of Elymalat, Sonbol Rood and Salaheddin-Kala dams
Location: Mazandaran, Iran
Project Status: Completed, 2003
ABGEER Services: Providing remedial plans for the Elymalat, Sonbol Rood, and Salaheddin-Kala dams, as well as monitoring the stability of them
Safety Assessment of the Mahabad Dam: Dynamic and rehabilitation Analysis of the Right-Sided Landslide Slope and Emergency Measures Preparation
Location: Mahabad, West Azerbaijan, Iran
Project Status: Completed, 2017
ABGEER Services: The project involves a dynamic analysis of the dam, along with a plan addressing a partial dam and a right-side landslide. This includes geological assessments, evaluations of seismic risks, analyses of the dam's dynamic behavior, and an examination of liquefaction effects in coarse-grained layers. Also, the development of emergency response instructions includes an analysis of potential dam failures, gathering social and economic data related to the project, assessing environmental conditions in the area, creating guidelines to address deficiencies, and reviewing meteorological data were be done.
Rehabilitation Study of Doroodzan Dam
Location: Fars, Iran
Project Status: Completed, 2015
ABGEER Services: Conducting technical inspections of the dam and its associated facilities, examining the dam's instrumentation and behavior mapping system, and providing recommendations for improvement. This includes a detailed investigation of the dam's safety and stability, along with suggestions for enhancements. Additionally, the examination of the spillway and its downstream channel up to the river intersection will be conducted, with corrective solutions provided as necessary. Engineering geological studies was performed to inform the design, as well as studies to assess the dam's seismic risk. Furthermore, stability analyses of the dam and its supports, along with static (stress-strain) analyses of the dam body and foundation was undertaken, as well as an investigation of the dam's hydro mechanical system.
Rehabilitation Study of Izadkhast Dam
Rehabilitation Study of Izadkhast Dam
Project Status: Completed, 2015
ABGEER Services: An investigation into the dam's instrumentation and behavior mapping system was conducted to identify areas for improvement. This investigation includes a detailed assessment of the dam's safety and stability, along with recommendations for enhancements. We collected data on the locations of geotechnical boreholes and conducted geological studies related to the design. Additionally, studies were performed to assess the dam's seismic risk, as well as to analyze the stability of the dam and its supports. A static analysis (stress-strain) of the dam's body and foundation was carried out to identify the causes of transverse and longitudinal cracks. Finally, an investigation of the dam's hydro-mechanical system was undertaken.